Projects

Explore RSP Civil Engineering Projects

Case studies are published only after evidence review. Additional studies are being verified and will appear here once approved.

Sanitary sewer collection system plan for a convenience store site, showing the wet well and sewer lift station, the grease trap, cleanouts CO1 and CO3 to CO9, and the length and diameter of each gravity sewer segment.

Case study· Engineering for Retail Development

Third Cycle sewer system evaluation surveys for three 7-Eleven stores in Miami-Dade County

Miami-Dade County, Florida

RSP Engineers carried out Third Cycle Sewer System Evaluation Surveys on the private sanitary sewer systems serving three 7-Eleven stores in Miami-Dade County. Each system was inspected, smoke tested and recorded on a sealed SSCS drawing, and DERM found all three in compliance with Chapter 24 in 2026.

Read case study →
Fire protection plan for a condominium community showing a new 8-inch water main, services to each multi-unit building, and fire hydrant coverage arcs across the site.

Case study· Multifamily Civil Engineering

Water main replacement and fire protection upgrade for a condominium community in Hallandale Beach

Hallandale Beach, Florida

An occupied condominium community in Hallandale Beach replaced its water distribution system with 2,533 feet of new 8-inch main, tapped into the public main under pressure, with fire hydrant coverage demonstrated building by building. Broward County approved the work on condition that no paved area was added.

Read case study →
Composite utility plan for a resort community showing a new 6-inch water main and 8-inch gravity sewer threaded between numbered occupied lots, with services to each lot.

Case study· Engineering for Sewer Infrastructure

Water main and gravity sewer replacement for an occupied resort community in Manatee County

Manatee County, Florida

An established resort community in Manatee County needed its water distribution and sanitary collection systems replaced beneath occupied lots. The approved design carries 2,765 feet of 8-inch gravity sewer, most of it at minimum grade on flat coastal ground, to a private lift station serving the county system.

Read case study →
Paving, grading and drainage plan for a concrete batching yard showing exfiltration trench runs, 18-inch storm pipe between drainage structures, and the proposed warehouse and office.

Case study· Engineering Robust Industrial Solutions

Site and drainage design for a mobile batch concrete yard in Palmetto, Manatee County

Palmetto, Florida

A 1.47-acre industrial infill site in Palmetto was developed as a mobile batch concrete yard with a service shop. Stormwater is held in 1,418 feet of exfiltration trench under the yard rather than in a pond, and the project carries both Manatee County final site plan approval and a Florida DEP permit for its wastewater system.

Read case study →
Drainage plan for an industrial outdoor storage yard showing proposed 18-inch perforated pipe on exfiltration trench, drainage structures and sub-basin areas across the site.

Case study· Engineering Robust Industrial Solutions

Drainage redesign for an industrial outdoor storage redevelopment in Medley, Miami-Dade County

Medley, Florida

A seven-acre industrial site in Medley was entirely impervious before redevelopment. The stormwater design cut impervious cover to 87.7 per cent, created a 0.447-acre retention area and more than quadrupled underground detention, and was approved by the Town of Medley, Miami-Dade County and Miami-Dade DERM.

Read case study →
Paving, grading and drainage plan showing two proposed stormwater channels feeding a collector pipe into an existing inlet.

Case study· Engineering for Stormwater Management

Drainage assessment and channel design for an established community in Fort Bend County

Fort Bend County, Texas

An established residential community in Fort Bend County had drainage its existing system was not resolving. RSP assessed conditions, researched permits, modelled the system and designed two trapezoidal channels and a collector pipe working back from a fixed tie-in invert, approved for construction by Fort Bend County.

Read case study →
Drainage plan showing proposed catch basins, curb inlets and storm pipe routed around an existing retention area and detention pond.

Case study· Engineering for Stormwater Management

Stormwater improvements for a senior living community in Frisco, Texas

Frisco, Texas

An occupied senior living campus in Frisco had drainage that no longer performed as designed. RSP assessed existing conditions, researched the permit record, modelled the stormwater system and designed a collection and regrading scheme approved for construction by the City of Frisco.

Read case study →
NRR102.2 Planning Engineer .jpg

Case study

288-Unit Residential Development in Dayton, OH

Dayton, OH

RSP Engineers completed full civil engineering design and site investigation for a 288-unit townhome residential development in Dayton, Ohio, including drainage, utilities, and site layout.

Read case study →
DH101 - Civil Engineering Firm.jpg

Case study

11-Unit Residential Subdivision in Seminole County, FL

Seminole County, FL

RSP Engineers led civil engineering design for an 11-lot residential subdivision in Seminole County, FL. Our team managed stormwater, utilities, and permitting from preliminary subdivision through SJRWMD ERP approval.

Read case study →
NRR107 - Drainage Engineer.jpg

Case study

13-Acre Mixed Use Site in Polk County, FL

Polk County, FL

RSP Engineers completed civil site feasibility for 13-acre mixed use project in Polk County, FL, including drainage, utilities, zoning, and wetlands evaluation.

Read case study →
RL101 - Civil Engineering Firm.jpg

Case study

45-Acre Industrial Outdoor Storage & Fueling Site

RSP Engineers supported the full site design and environmental permitting, a 45-acre Industrial Outdoor Storage site with a private gas station, including stormwater plans, utility design, wetland mitigation, and ERP coordination in Polk County.

Read case study →
NRR102 - Planning Engineer .jpg

Case study

312,000 SF Commercial Development in Dayton, OH

Dayton, OH

RSP Engineers delivered full civil engineering design and site investigation for a 312,000 SF commercial development in Dayton, OH, including carwash, gas station, and site access planning.

Read case study →
SE101 - Civil Engineering Firm.jpg

Case study

87-Unit Townhome Subdivision in Seminole County, FL

Seminole County, FL

RSP Engineers delivered civil engineering and full permitting for an 87-unit townhome subdivision in Seminole County, FL. Services included rezoning, stormwater, and SJRWMD ERP approval.

Read case study →