
Case study· Engineering Robust Industrial Solutions
Drainage redesign for an industrial outdoor storage redevelopment in Medley, Miami-Dade County
Medley, Florida
A seven-acre industrial site in Medley was entirely impervious before redevelopment. The stormwater design cut impervious cover to 87.7 per cent, created a 0.447-acre retention area and more than quadrupled underground detention, and was approved by the Town of Medley, Miami-Dade County and Miami-Dade DERM.
Read case study →

