
civil
Utility Infrastructure Design
RSP Engineers designs utility infrastructure, including water and sewer systems, for reliable project outcomes.
Explore serviceCase study · Multifamily Civil Engineering
An occupied condominium community in Hallandale Beach replaced its water distribution system with 2,533 feet of new 8-inch main, tapped into the public main under pressure, with fire hydrant coverage demonstrated building by building. Broward County approved the work on condition that no paved area was added.
Client and site identifiers are withheld under a confidentiality agreement; the scope, role and outcomes described are documented in the project record.

A condominium community in Hallandale Beach, in Broward County, needed its water distribution system replaced and its fire protection brought up to current coverage. The community is built out and occupied: four condominium groupings of multi-unit buildings, with private drives, parking and a tennis court between them.
RSP designed the replacement water main, the service connections to each building, the fire hydrant layout, and the paving and marking work that follows from opening up a site like this. The project went through Broward County's environmental review before a building permit could be sought.
The governing constraint came from the approval itself. Broward County's environmental review approved the work as site work and water piping only, with no sewer line work, and recorded asphalt resurfacing with the explicit condition of no additional square footage of asphalt paved area. That is a real design limit rather than a formality: a project that opens trenches across a site and then restores it is very easy to finish with more pavement than it started with, and here the area had to come back the same.
The second constraint is the one common to any utility replacement in an occupied community. Residents need water throughout, and fire protection cannot lapse while hydrants are being changed. Existing hydrants are therefore marked individually for replacement or retention rather than being swept away as a set, and the old main is abandoned in place rather than excavated, which avoids a second round of trenching through finished surfaces purely to remove a pipe that is no longer doing anything.
The third is geometric. The buildings are long and close together, so the main has to find a route that stays clear of structures, parking and the existing overhead electric, while still passing near enough to each building to make a short service connection and near enough to the drives to keep hydrants reachable.
The new distribution system is 2,533.5 linear feet of 8-inch PVC in seventeen runs, routed around the community and connected to the existing public main through a 16-inch tapping sleeve and an 8-inch tapping valve. Tapping into a live main under pressure, rather than cutting it, is what lets the connection be made without taking the supply down.
Each multi-unit building takes a two-inch PVC service off that main. The existing backflow preventer at the point of service remains, so the community's protection arrangement with the utility is unchanged by the work.
Fire protection was designed by coverage rather than by replacement count. The fire protection sheets draw a coverage arc around every hydrant, existing and proposed, so the layout can be read as a question of whether each building falls inside one. Some existing hydrants are marked to be removed and replaced in position, two are kept, and new hydrants are added where the arcs leave a gap. Hydrants are specified to deliver a minimum of 1,250 gallons per minute at the required residual pressure.
The remaining sheets cover what that work disturbs: a demolition plan for the asphalt removed and the main abandoned, paving and grading with cross sections, and marking and signage including accessible parking and its signage. The set is fifteen sheets, C-1 through C-5.1.
Broward County's Resilient Environment Department issued an Environmental Review Approval Certificate on 1 April 2024 under ER review 000449739, approving the plans under section 27-66 of the county's Natural Resource Protection Code, with the City of Hallandale Beach as the building department jurisdiction.
It is worth being precise about what that certificate is. It is an environmental review approval, not a building permit, and it is specific to the plans and description it names: any change in footprint or use requires a new approval, and if a building permit is not applied for within ninety days the plans go back to the Urban Planning Division for re-evaluation. It is the gate that has to be passed before the building department will take the work, which is why it sits on the critical path of a project whose physical scope is pipe and pavement.
The community has an approved design for a complete replacement of its water distribution system, with fire hydrant coverage demonstrated building by building rather than asserted, and with the paved area returning to what it was.
The transferable point concerns the abandoned main. Leaving a redundant pipe in place is often read as a shortcut, and on some sites it is. Here it is the opposite: excavating it would mean opening the same trenches twice, restoring the same surfaces twice, and - under this approval - doing so without adding a square foot of pavement in the process. The cheapest and least disruptive answer and the one the approval allows are the same answer, which is not always how it works out.
Because removing it means opening the same trenches a second time and restoring the same surfaces again, for no benefit once the pipe is out of service and capped. On a finished, occupied site that doubles the disruption, and where an approval limits paved area it also doubles the restoration that has to come back to exactly what was there before.
By drawing it. Each hydrant, existing and proposed, gets a coverage arc on the plan, and the layout is judged on whether every building falls within one. That turns hydrant positions from a matter of opinion into something a reviewer can check at a glance, and it shows which existing hydrants are worth keeping rather than replacing the lot.
A tapping sleeve clamps around the existing pressurised main and a valve is bolted to it, then the main is cut from inside the sleeve. The connection is made without draining the pipe, so the existing supply stays in service. Here a 16-inch main was tapped with an 8-inch valve to feed the new distribution system.
No. In Broward County it is a separate approval under the Natural Resource Protection Code that has to be in hand before the building department will take the work. It is specific to the plans it names, and it lapses for re-evaluation if a building permit is not applied for within ninety days of issue.
A survey, whatever is known about the existing main including its material, size and age, and the location of the utility connection and any backflow protection. For the fire side, the current hydrant positions and the building footprints, because coverage is what decides how many new hydrants the project actually needs.

civil
RSP Engineers designs utility infrastructure, including water and sewer systems, for reliable project outcomes.
Explore service
civil
RSP Engineers provides engineering land development services to transform properties effectively.
Explore service
civil · environmental
RSP Engineers offers civil and environmental engineering services for sustainable project solutions.
Explore service
Market
RSP Engineers multifamily civil engineering. We design high-density sites, infrastructure and permitting for investment-grade communities.
See how we help
Market
RSP Engineers residential civil engineering for homes and communities. We create desirable neighborhoods through site planning and infrastructure design.
See how we helpTell us about the site, schedule and jurisdiction and we will outline an approach.