Environmental Resource Permits (ERP) in Florida: A Developer’s Guide

For any new land development project in Florida, securing an Environmental Resource Permit (ERP) is one of the most crucial steps before construction begins. These permits regulate how land, water, and stormwater systems interact with the environment — ensuring sustainable development while protecting Florida’s natural resources.

Whether you’re building a residential community, commercial plaza, or mixed-use property, understanding the ERP process helps avoid costly delays and ensures full compliance with state and county requirements.

Why Environmental Resource Permits Matter

Florida’s unique ecosystem demands careful planning. The ERP program, managed by the Florida Department of Environmental Protection (FDEP) and the state’s Water Management Districts, governs activities that alter land elevation, surface water, or drainage patterns.

An approved ERP confirms that your project meets stormwater, water quality, and flood protection standards — essential for long-term community safety and environmental sustainability. For developers, working with an experienced civil engineering company or drainage engineer ensures that all technical documents are accurate and code-compliant before submission.

Key Components of the ERP Process

TaskDetails
Pre-Application ConsultationMeet with FDEP or Water Management District staff to confirm permitting needs and identify potential environmental constraints.
Site EvaluationAssess wetlands, flood zones, and existing drainage to determine project impact on natural systems.
Stormwater DesignDevelop compliant stormwater management systems that meet water quality and flood protection standards.
Permit ApplicationSubmit engineering plans, environmental assessments, and supporting calculations for agency review.
Compliance & MonitoringAfter approval, ensure ongoing site inspections, as-built certification, and permit condition compliance.

Working With Permitting Agencies

The ERP process often involves coordination between multiple agencies — including FDEP, the South Florida Water Management District (SFWMD), and county engineering departments. A qualified planning engineer or land development consultant ensures that submittals meet all regional and county-specific standards.

Establishing clear communication early in the process helps streamline reviews and minimize back-and-forth comments that can delay construction.

Common Challenges

Developers often underestimate the complexity of ERP reviews. Common issues include:

  • Incomplete drainage or wetland impact documentation.

  • Conflicts between county and state design standards.

  • Late submittals of required stormwater calculations or environmental reports.

Working with a professional engineering consulting team prevents these delays by anticipating agency expectations and preparing robust, code-compliant plans.

Conclusion

Environmental Resource Permits are a cornerstone of responsible land development in Florida. Understanding the process, planning early, and partnering with experienced engineers ensures smooth approvals and environmentally sound outcomes.

FAQs

  • An ERP authorizes construction or alteration that affects surface water or wetlands in Florida, ensuring proper stormwater treatment and flood protection.

  • ERPs are issued by the Florida Department of Environmental Protection or one of the state’s Water Management Districts, depending on the project’s location.

  • The review process can take several weeks to a few months depending on project complexity and agency workload.

  • Most projects involving drainage, grading, or wetland alteration do. Early consultation with a civil engineer near me helps confirm your specific requirements.

Partnering With Florida Experts for Development Success

At RSP Engineers, we specialize in preparing Environmental Resource Permit applications and full stormwater plans for Florida developers. Our multidisciplinary team ensures that every design meets environmental, regulatory, and community standards — streamlining approval from start to finish.

Contact Us
Services
Next
Next

The Role of County Engineers in Florida Land Development