INDUSTRIAL REDEVELOPMENT FOR FUTURE STORAGE FACILITY IN THE TOWN OF MEDLEY FLORIDA

CIVIL ENGINEERING DESIGN AND PERMITTING

RSP is pleased to announce the successful completion of the civil engineering final design phase and Miami Dade County permitting for an industrial redevelopment project for a future storage facility in the Town of Medley, Florida.

Civil Engineering Services:

  • Site investigation

  • Existing condition drainage assessment

  • Closed circuit television stormwater evaluation.

  • Stormwater modeling

  • Flood Analysis.

  • FEMA Flood Map Study.

  • Stormwater Report.

  • Finish Floor Elevation Determination.

https://msc.fema.gov/portal/home

https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html?bkmrk=fl

Construction Documents:

  • Demolition Plan

  • Stormwater Pollution Prevention Plan

  • Paving Grading and Drainage Plan

  • Paving Grading and Drainage Details

  • Water and Sewer Utility Plan

RSP Engineers also managed to achieve this goal by successfully coordinating the submittals and responding to comments of the corresponding permitting entities.

Civil Engineering Permitting Included:

  • Miami Dade County Building Permit

  • Town of Medley Building Permit

  • Miami Dade County - DERM

https://www.miamidade.gov/permits/site-map.asp#0