Site Investigation and Drainage Assessment
Our team conducted a comprehensive site investigation to evaluate existing conditions and assess drainage patterns. This assessment informed the design process, ensuring effective stormwater management and compliance with Miami-Dade County regulations.
Stormwater Modeling and Flood Analysis
Utilizing advanced modeling techniques, we analyzed stormwater runoff and flood risks. This analysis guided the development of a robust stormwater management plan, mitigating potential flooding issues and aligning with FEMA guidelines.
Finish Floor Elevation Determination
Determining appropriate finish floor elevations was critical for flood resilience. Our calculations ensured that the building's elevation met or exceeded local requirements, enhancing the safety and longevity of the structure.
Paving, Grading, and Drainage Plans
We developed detailed paving, grading, and drainage plans to facilitate proper site development. These plans addressed surface runoff, erosion control, and integrated seamlessly with existing infrastructure.
Utility Coordination and Permitting
RSP Engineers coordinated with local utility providers and permitting agencies, including Miami-Dade County DERM and the Town of Medley, to ensure all aspects of the project met regulatory standards and timelines.
https://msc.fema.gov/portal/home
https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html?bkmrk=fl
Construction Documents:
Site Plan
Truck Access Plans
Demolition Plan
Stormwater Pollution Prevention Plan
Paving Grading and Drainage Plan
Paving Grading and Drainage Details